Assessing the risks of using Building Information Modeling (BIM) in construction projects

Authors

1 M.Sc. Student of Engineering & Construction Management, Department of Civil Engineering, Islamic Azad University (Karaj Branch), Karaj, Iran

2 B.Eng. Student, Faculty of Civil & Architectural Engineering, Islamic Azad University (Qazvin Branch), Qazvin, Iran

Abstract

Today, building information modeling (BIM) has emerged to increase the productivity of work processes in the construction industry, overcome the current problems and problems of this industry, and also create and produce products according to the real needs of the customer. In addition to the potential benefits of using this technology for all those involved in the construction industry, due to the newness of this technology, there will be barriers and risks to applying BIM instead of current traditional work processes. In this research, using literature review, case studies and experts' opinions, the risks of using BIM in construction projects were first identified. In order to rank the risks of using BIM based on the impact they can have on the project, the fuzzy TOPSIS technique, which is a multi-criteria decision-making method, was used. For this purpose, the fuzzy average of the experts' opinions about the probability of occurrence and the severity of the risks was calculated. Then, by multiplying the probability of occurrence by the intensity of the effect, the number of risks was obtained based on the effect on the main goals of the project, which formed the decision matrix. Finally, using the TOPSIS Fuzzy method, the risks of using BIM were ranked, which are the lack of familiarity of the specialized team with BIM work processes and the lack of necessary hardware infrastructure for the implementation of BIM software in optimal conditions were among the most important risks evaluated.

Keywords

Main Subjects


  1. Eastman, C. , P. Teicholz, et al. (2011), BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors , John Wiley & Sons, Inc.
  2. Taylor J.E., Bernstein P.G., (2009), Paradigm trajectories of building information modeling practice in project networks, Journal of Management in Engineering, ASCE 25 (2) 69–76.
  3. Deutsch, R. (2011). BIM and Integrated Design: Strategies for Architectural Practice: John Wiley and Sons.
  4. Pan, J., Teklu, Y., Rahman, S. and Castro, A. D. (2000). "An Interval-based MADM Approach to the
  5. Identification of Candidate Alternatives in Strategic Resource Planning." IEEE Transactions on Power Systems, Vol.15, No. 4, PP. 1441-1446.
  6. North, D. W. (1995). "Limitations, Definitions, Principles and Methods of Risk Analysis." OIE Review of Science and Technology. Epiz., Vol.14, No. 4.
  7. Zandin, K. B. (2001). Maynard’s Industrial Engineering Handbook, 5th Edition, McGraw-Hill.
  8. Lambert, J. H., Haimes, Y.Y., Li, D., Schooff, R. M. and Tulsiani, V. (2001). "Identification, ranking, and
  9. management of risks in a major system acquisition." Reliability Engineering and System Safety, No.72, PP.
  10. سبزه پرور م. ، 1391، کنترل پروژه به روش گام به گام، انتشارات ترمه.
  11. PMI, 2008. A Guide to the Project Management Body of Knowledge(PMBOK® Guide), 4th edition. Project Management Institute, Newton Square, Pennsylvania, USA.
  12. Hwang, C., Yoon, K., Multiple Attribute Decision Making Methods and Applications: A state of the art survey, New York: Verlag, 1989.
  13. الفت ل.، خسروانی ف.، جلالی ر.، 1389، شناسایی و اولویت بندی ریسک پروژه بر مبنای استاندارد PMBOK با رویکرد فازی، فصلنامه علمی پژوهشی مطالعات مدیریت صنعتی، سال هشتم، شماره 19.
  14. Chen, S.J., and Hwang, C.L. (1992) Fuzzy Multiple Attribute Decision Making. Lecture Notes in Econom. and Math. System 375, Springer-Verlag, New York.