Faculty of Engineering, Higher Education and Development Institute,hamedan,iran
Abstract
Today, using project management methods and tools to realize the goals of many organizations and companies It is essential. Scheduling of activities, to minimize costs by using limited resources and in Conditions of existence of time-sensitive constraints are used. These methods are the ability of the organization They improve the implementation and control of projects and ways to use resources and individuals. Many methods The existing scheduling of the activities of a project is applicable, while complicated Many organizations face the challenge of managing multiple projects simultaneously. So use Methodology of Scheduling of Projects with Artificial Intelligence and with the Approach of Ant Colony Algorithm for Organizations Method Optimal and practical among other methods. In this article, the methods of solving and characteristics of issues The timing of the projects and the work done in this area has been studied and compared. At The results of this study are presented at the end of this study and future research fields have been introduced.
Ahghari, K. (2018). Application of Artificial Intelligence with Ant Colony Algorithm in construction projects schedule. Journal of Engineering & Construction Management, 3(3), 11-14.
MLA
Kiana Ahghari. "Application of Artificial Intelligence with Ant Colony Algorithm in construction projects schedule". Journal of Engineering & Construction Management, 3, 3, 2018, 11-14.
HARVARD
Ahghari, K. (2018). 'Application of Artificial Intelligence with Ant Colony Algorithm in construction projects schedule', Journal of Engineering & Construction Management, 3(3), pp. 11-14.
VANCOUVER
Ahghari, K. Application of Artificial Intelligence with Ant Colony Algorithm in construction projects schedule. Journal of Engineering & Construction Management, 2018; 3(3): 11-14.